Send Message
Home ProductsPolyurethane Waterproof Coating

Double Component Spray Polyurethane Waterproof Coating

Certification
China Qingdao Exceed Fine Chemicals Co.,Ltd certification
China Qingdao Exceed Fine Chemicals Co.,Ltd certification
Customer Reviews
Exceed team is very professional and trustable. It is lucky to build business relationship with you.

—— Mr Nogarotto

Hope have a long relationship with you, I love China.

—— Mr Elmogy

Great thanks for help. Exceed is very Professional.

—— Mr Shirish

Thanks for your good after-sale service. Excellent training and technology support helps me a lot.

—— Modje

Good packaging, received product well.

—— Mr Nimit

Good partner

—— Mr Michele

I'm Online Chat Now

Double Component Spray Polyurethane Waterproof Coating

Double Component Spray Polyurethane Waterproof Coating
Double Component Spray Polyurethane Waterproof Coating

Large Image :  Double Component Spray Polyurethane Waterproof Coating

Product Details:
Place of Origin: China
Brand Name: EXCEEDCHEM
Certification: ISO9001:2008
Model Number: Spray Polyurea Elastic Waterproof Coating
Payment & Shipping Terms:
Minimum Order Quantity: 1mt
Price: FOB Qingdao usd4.85-5.5/kg
Packaging Details: 20kg/drum; 200kg/drum
Delivery Time: 5-8 work days
Payment Terms: L/C, T/T
Supply Ability: 3000mt/month

Double Component Spray Polyurethane Waterproof Coating

Description
Material: Polyurea Environmental: Yes
Operation: Spray Ration: 1:1
Packing: 200kg/drum
High Light:

Spray Polyurethane Waterproof Coating

,

Double Component Polyurethane Waterproof Coating

Spray Polyurea Elastic Waterproof Coating

 

1. Introduction

This product is a double-component coating. A component is isocyanate compounds; B component is amine compounds. Construction technology is applied by spraying to mix the two components, generating the elastic waterproof coating.

 

2. Characteristics

  • High active and fast set.
  • Solid content, no volatilization of organics, nontoxic, environmental friendly.
  • Have great strengthened adhesion and nonmetal materials, such as steel, aluminum, concrete, timber, glass fiber reinforced plastic and polyurethane froth.
  • It is insensitive to the temperature and the humidity.
  • It is steady in both low temperature and the high temperature.
  • Good weathering resistance and aging resistance.
  • Excellent physical property.
  • Outstanding function in waterproofing, decoration, anticorrosion, and anti-slip.
  • Use the complete set of equipment to spray.
  • Produce different colors according to the requirements.

3. Applications

It is widely used in all kinds of waterproof anti-corrosion projects, especially suitable for the following projects.

* Waterproofing projects: high-speed railway, tunnel, concrete road, bridge, airplane parking, etc.

* Industry and civil construction: roof waterproofing projects, etc.

* Underground waterproofing and moisture−proofing projects: industrial and civil construction, indoor swimming pools, etc.

* Government projects: subway, landfill, sewage farm, etc.

* Anti-corrosion projects: water conservancy, etc.

 

4. Physical properties

No Item
1 Solid content/% ≥ 96 98
2 Gel time/s ≤ 45
3 Dry time/s ≤ 120
4 Tensile strength/Mpa ≥ 10.0 16.0
5 Breaking elongation,(normal temperature)/% ≥ 300 450
6 Tear strength/(N/mm) ≥ 40 50
7 Water impermeability / 0.4Mpa, 2h Impermeable
8 Flexibility at low temperature/°C ≤ -35 -40
9 Heating Shrinking / % Expansion ≤ 1.0
Shrinking ≤ 1.0
10 Bonding strength/ Mpa ≥ 2.0 2.5
11 Salt Resistance Flexibility at low temperature/°C ≤ -30 -35
Tensile strength Stability/% 80-150
Breaking elongation/% ≥ 250 400
12 Synthetic aging Flexibility at low temperature/°C ≤ -30 -35
Tensile strength Stability/% 80-150
Breaking elongation/% ≥ 250 400

Remark: Product property can be customized.

 

5. Attention

  • It is supposed to be sealed and stored upside down in a cool and dry place, avoiding direct sun exposure and humidity.
  • During storage, there would be buildups on its surface. Just get rid of the buildups before application.
  • Unspent coating is supposed to be sealed timely in case of curing and abandoned.
  • During and after the process of waterproof construction, protect it timely, preventing from artificial damage.
  • The storehouse or construction site should be kept away from fire. In the process of construction, workers should wear protective clothing.
  • Storage time is 6 months. If it is qualified enough beyond storage time, it can still be put into use.

Contact Details
Qingdao Exceed Fine Chemicals Co.,Ltd

Contact Person: Louis.liu

Tel: 86-15275281902

Fax: 86-532-82693196

Send your inquiry directly to us (0 / 3000)